Critical & Required Repairs
Our schools need a variety of repairs, from fixing leaky roofs to repairing heating systems. Thanks to the Central Kitsap community's approval of a bond on the Feb. 9, 2016, we will make critical and required repairs at our schools, including:Illustration of tools
  • Heating and air conditioning system repairs 
  • Electrical repairs
  • Repairing or replacing roofs
  • Repairing walkways and driveways
  • Improvements at Silverdale Stadium, including a locker room and showers
  • Exterior and interior improvements at schools
  • Improving athletic fields at several schools

Why They're Needed

More than half of our schools are 30 years old or older. Most major school roofing, heating, electrical and other systems were designed to last about 20 to 30 years.

By repairing or replacing major systems, we reduce long-term maintenance costs. These projects keep our classroom and other learning environments safe and healthy. Then, students can focus on learning, not on whether their classroom is too hot or too cold. 

Repairs by School

See the critical and required repairs needed at each school by clicking on each school name below.

Brownsville Elementary

  • Repair exterior siding
  • Repair exterior windows

Clear Creek Elementary

  • Replace operable wall in gymnasium 
  • Update playground equipment

Cougar Valley Elementary

  • Heating and ventilation system – repair/replace
  • Improve vehicular access
  • Install additional parking
  • Update playground equipment

Emerald Heights Elementary

  • Repair exterior walls (west side of gymnasium)
  • Replace roof on portable classroom
  • Update playground equipment

Esquire Hills Elementary

  • New operable walls in multi-purpose room
  • Update playground equipment

Green Mountain Elementary

  • Repair/replace heating and ventilation system
  • Replace roof 
  • Update playground equipment

PineCrest Elementary

☑ Install classroom doors

  • Improve walkway near gym – extend rock wall,  new drains along walkways
  • Update playground equipment

Silverdale Elementary

Major renovation work is underway at Silverdale, thanks to voter support of a 2011 capital projects measure. The proposed replacement measure on the February ballot would fund further work: an update to the school's playground equipment.

Silver Ridge Elementary

  • Heating and ventilation system – repair/replace 
  • New gymnasium/music room partitions
  • Replace tile floor in gymnasium
  • Replace roof on portable classroom
  • Update playground equipment

Woodlands Elementary

  • Improve drainage for the playfield
  • Update playground equipment

Fairview Middle

☑  Re-surface and re-stripe track

Ridgetop Middle

  • Heating and ventilation distribution systems – replace classroom air handling units
  • Electrical distribution repairs
  • Repair divider curtain – auxiliary gymnasium
  • Tile flooring repairs

Klahowya Secondary

In addition to the repairs below, major construction is also planned for Klahowya. Work includes an addition for more classrooms, an auxiliary gymnasium and middle school band room. Visit the Klahowya project page for more details.

☑  Update Entrance Cover
☑  Roof Repairs and Painting

  • All – Weather Athletic Field
    • Turf on Football Field; New Surface on Track
    • Install Drainage on Lower Athletic Field

Olympic High

In addition to the repairs below, major construction is also planned for Olympic. Proposed work includes replacing portables with permanent classrooms, modernizing career and technical education classrooms and updating the commons. Visit the Olympic project page for more details.

  • Improve pedestrian access – multiple areas
  • All-weather athletic field
  • Upgrade Silverdale Stadium – changing rooms, restrooms, and improve access for those with disabilities
  • Install all-weather practice field