Above: Ridgetop's scenic track was repainted in August. Below: Early this summer, Fairview's track was prepared for resurfacing.
Students at Fairview and Ridgetop will run on fresh track surfaces this coming school year thanks to you!
At both schools, crews resurfaced and repainted the tracks.
These are just two of the projects going on at our schools this summer. One was funded through the 2011 capital projects levy, while the other is funded with the 2016 bonds.
Thank you for supporting our students and schools!